Starting the week of Nov. 8, 2021, contractors will be removing and replacing parking lot lighting fixture heads in all parking lots on the Springfield campus. They plan on removing and replacing light fixture heads on existing light poles one parking lot at a time. As an example, Lot 1 might be closed for 2-3 days, then opened back up and they will move on to Lot 2 for 2-3 days and so on around to all parking lots. The contractor will provide traffic control measures and directional signage during this time. We anticipate that they will be working their way around the parking lots through mid-January 2022. If anyone has any questions or concerns, please call Tim Ervin at 217-786-9605 or at tim.ervin@llcc.edu.