Starting on Monday, May 20 contractors will be working in Menard Hall, Sangamon Hall and Cass Gym. Flooring in the lower level of Menard Hall, including the student union and the hallways around Student Life, Quiznos, bookstore and IT areas, will be affected by this work. Access to Quiznos, bookstore and Student Life will be maintained at all times. Be aware that using an alternate stairway or door to access these areas might be necessary throughout construction. In Sangamon Hall, minor flooring work will be occurring in the northeast corner of the second floor near the study lounge. In Cass Gym, the entry lobby, classroom and all three stairways will be affected by construction and will be unavailable at various times during the construction. We anticipate that this work will continue through early August. If you have any questions or concerns, please contact Tim Ervin at 786-9605 or at tim.ervin@llcc.edu.