Flooring to be replaced in A. Lincoln Commons and Quiznos during winter recess

During winter recess, contractors will be working to replace flooring in A. Lincoln Commons (first floor and second floor catwalk) and Quiznos/kitchen in the lower level of Menard Hall. Starting on Dec. 14, contractors will begin to mobilize, and A. Lincoln Commons will be largely inaccessible and the Quiznos/kitchen area will be unavailable starting on Dec. 15. We have asked contractors to provide caution tape at open areas that are inaccessible during this time. If you are on campus during winter recess, please use caution in and around these areas. Please contact Tim Ervin in construction management at 786-9605 with any questions or concerns.