Hallway and sidewalk closures for conduit repair

As a part of the sidewalk lighting improvement project that is ongoing, the crew working on the directional boring machine to the east of Menard Hall inadvertently damaged a conduit by the sidewalk. There is a small amount of water that got into the building downstairs outside the server room (M-0021) in the hallway, and this hallway will be closed until the conduit is repaired. In addition, please be aware of any sidewalk closures that occur in the next few day as some areas of sidewalk immediately outside Menard Hall may need to be removed to repair the damaged conduit.